- Drupal CMS Developer
- Website speed optimisation
- Drupal 6 to Drupal 8 migrations
Greenhotelier.org - new Drupal Website
I was contacted by ILN (http://www.iln.co.uk/ILN) and asked to help with a website that they had a very short deadline on. I was asked to set up Drupal, configure it, build the sections - each with unique functionality, and implement an html design all in a short period. The actual project took 2.5 days in the end, I am still quite impressed at how quickly I was able to complete a Drupal website from scratch.
ILN being a design company themselves were able to provide me with detailed plans for each section of the website as well as wireframes allowing me to go away and build it. Each section was unique and had something which was challenging and I hadn't done before. As the website was going to have to work to fit the designs rather than the designs being based on Drupal, a lot of the work was in the detail, but nevertheless, it was completed with great success and praise.
- Portfolio Category: